Portal de Archena

www.portaldearchena.com

Archena - SpanishArchena - English
detail of Archena

 

Press release platform in defense of public school Archena (31/03/2009)

All residents of Archena |

Press him on the platform:

At the meeting held on Wednesday 25 March, reported:

The deplorable conditions of overcrowding Archena teaching of students in the state of the centers and the complaint filed in Occupational Hazards about the deterioration of Dr. Pedro Guillén Institute.

The problems of schooling for next year and urgent solution.

The "gift" of 10,162 m 2 at a private school.

The school situation is a consequence of the lack of foresight and no educational planning of the Ministry of Education in complicity with the Mayor of Archena.

School problems, crawling over the years. Years ago, we are requesting a new public school in two lines Archena.

Etc.

1.

Conditions in public schools in kindergarten and primary Archena. Terms of teaching.

(Source: Ministry of Education, March 2009.)

In all centers far exceeds the maximum class sizes.

We have 80% of overcrowded classrooms (some up to 32 students), two schools is 90%

In 4 centers have unfolded groups, representing the loss of spaces for other uses (music room, library language, etc.).

The CP Miguel Medina no decent places to site management for AT and PT, has classrooms that violate the minimum conditions for a risk assessment, playground and sports facilities completely inadequate, and so on.

There are schools with classrooms E.

Children who do not meet the minimum requirements (toilets unincorporated classroom situation and stairs, etc.).

Has not increased the supply of seats and has built any new center for over 20 years and the population has increased by more than 5,000 people (CP centers IES Río Segura and V. Medina are replaced).

2.

Schooling for the beginning of next year.

Solutions.

Has the deadline to enroll our children and there are more students than classrooms, Children 3 years there are 250 applications, apart from the other courses.

2 missing last year and this even more.

This has already been known for years. For the coming academic year will be needed urgently:

More classrooms, at least 2 in E.

Children 3 years to school classrooms these students m ore to split courses exceed the maximum number of students per classroom.

Choose the schools where classrooms and will be located children.

3.

Action by the City Council and Ministry of Education.

Have managed some subsidies for fencing arrangements, minor works in different centers.

With regard to building a new public school as we have been demanding double line for years, the City has to give land to the Ministry of Education. The mayor does not.

Archena Mayor and the Director General of Department have all the information on the educational reality and the needs of our people. Intentionally year after year have ceased to be worse, damaging the work and study conditions for all. Always with a purpose Fitting of a private school.

3.

Mayor Archena "gift" 10,162 m 2 for a private school.

So, the Mayor of Archena aims to "give" a municipal solar 10,162 m 2 in La Morra (near the new Institute) for a private school (which prompted educational concert). The plot is valued at a very low price for that the bond is very low.

In short, a "gift" for those who want education as a business.

This is the second attempt in the first failed because of opposition from the Platform in Defense of Public School ..

Already there are high expectations about private school Archena.

A group of very economically solvent and close to power, are interested in becoming partners in the private school.

4. To make efforts and work on behalf of Public School Platform has selected a group of representatives from: Parents, teachers and union representatives, to coordinate tasks.

Agree:

1 .- To inform parents, AMPAS meetings and newsletters.

And collecting signatures against the sale of municipal solar (10,162 m 2) for a private school.

2 .- Ask them to put the education of children for those who still do not have classroom and that schools are going to get.

3 .- To request interviews Archena Mr. Mayor and the Director General of Department and ask the Mayor to cede land to the Ministry of Education to build a new public school, as did the Mayor of Ceuta

-NO TO COLLAPSE IN SCHOOLS FOR CHILDREN AND PRIMARY ARCHENA.

PROBLEM SOLUTION IES.

"P.

GUILLEN "

"NOT THE" GIFT "OF PUBLIC LAND FOR PRIVATE SCHOOL

Source: Plataforma en defensa de la escuela pública

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información