The Mayor of Archena, Patricia Fernández, has visited this morning some works of the plan of arrangement and paving of the thirteen streets that will be affected by these important reforms.
The project, which has already begun, has as its object the paving works, by means of a layer of asphalt agglomerate in heating, of the following roads:
• Calle Maestro Miguel Fernández
• Carretera del Balneario Avenue
• Venezuela Street
• Bolivia Street
• Calle Alhama
• Vera Cruz Street
• Clavel Street
• Las Minas Street
• Calle Albudeite and Torrepacheco
It is also proposed in the Calle Mayor and San Juan the raised pavement of cobblestone, prefabricated concrete rustic model, existing and later repositioning with a porphyritic gravim and a good reception of joints.
In addition, 3 pedestrian crossings will be carried out on Ronda del Ope Avenue, to order traffic between vehicles and pedestrians, and to reduce the speed of passage.
The total of square meters to pave in the diverse performances that are reflected in this work are of 11,017 square meters.
The work in general lines will cost more than 92,000 euros and a term of execution of two months.
Source: Ayuntamiento de Archena