Portal de Archena

www.portaldearchena.com

Archena - SpanishArchena - English
detail of Archena

 

Development has earmarked more than 473,000 euros to rehabilitate 51 public housing in Archena (04/10/2016)

The Ministry of Public Works and Infrastructure is proposing a budget of 473,473 euros for comprehensive rehabilitation and improvement of the services and facilities of a group of 51 houses of public property, intended for rental, in the area of ​​the Algaida, in Murcia.

The Director General of Planning, Architecture and Housing, Nuria Fuentes, said today that "the objective is that families with limited economic resources to access public housing in optimal conditions of habitability."

Sources said that today go out to tender in the Official Gazette of the Region (BORM) works to improve sanitation facilities and supply of housing and the renovation of the exterior carpentry to provide adequate energy efficiency thermal envelope property.

The homes, which are located in the streets Francisco Quevedo and Espronceda, will be equipped with better services and equipment by developing a series of works and maintenance and intervention.

The action will focus on improving water supply and sanitation networks, waterproofing and improve decks and accessibility of housing.

The buildings are single-family detached, duplex, two floors and two, three and four bedroom apartments and are located on a plot of 2,700 square meters, with a construction area of ​​4,385 square meters.

Specifically, two two-bedroom houses, 40 three-bedroom, eight in four bedrooms and a housing for people with disabilities or reduced mobility benefit two bedrooms.

Nuria Fuentes stressed that the rehabilitation of housing "will run in two separate projects, so they can be executed consecutively or jointly, thus facilitating the planning of the works as these should be organized considering that the houses are inhabited today. "

a first intervention to improve supply facilities and sanitation, with an investment of 233,282 euros, and a second that will focus on the renewal of the woodwork of the houses to increase the conditions of the thermal envelope of the same will be done, with 240,184 euros.

The deadline for execution of works is 20 weeks.

Rehabilitation of 477 public housing

This action is part of the Comprehensive Plan for Rehabilitation of Public Housing, the Ministry of Development held in 477 public housing in nine municipalities in the region (Abarán, Sewer, Archena, Blanca, Ceuta, Cieza, Lorquí, Molina de Segura and Villanueva del Río Segura).

The regional government allocated a total investment of 2.45 million euros to improve public housing under the current Housing Plan, which funded the regional government and the central.

"It's about improving the quality of life of tenants, by adapting the buildings, their integration into the urban fabric and the renewal of the image of this group of houses," said the CEO.

Source: CARM

Notice
UNE-EN ISO 9001:2000 - ER-0131/2006 Región de Murcia
© 2024 Alamo Networks S.L. - C/Alamo 8, 30850 Totana (Murcia) Privacy policy - Legal notice - Cookies
Este sitio web utiliza cookies para facilitar y mejorar la navegación. Si continúas navegando, consideramos que aceptas su uso. Más información